Projects

INTERNATIONAL FUNDED RESEARCH PROJECTS

Submitted research projects

AM-Math
Project title: Mathematical Challenges of Additive Manufacturing
Call identifier: H2020-MSCA-ITN-2018
Type of action: MSCA-ITN-ETN
Proposal number: 813714
Duration: 48 months
Project coordinator: SINTEF AS (NO)
Participants: SINTEF AS (NO), TECHNISCHE UNIVERSITAET MUENCHEN (DE), UMEA UNIVERSITET (SE), UNIVERSITA DEGLI STUDI DI PAVIA (IT), CENTRE INTERNACIONAL DE METODES NUMERICS EN ENGINYERIA (ES), TECHNION - ISRAEL INSTITUTE OF TECHNOLOGY (IL), CONSIGLIO NAZIONALE DELLE RICERCHE (IT), UNIVERSITAT POLITECNICA DE CATALUNYA (ES), MISSLER SOFTWARE (FR), AKER SOLUTIONS AS (NO), SINGAPORE UNIVERSITY OF TECHNOLOGY AND DESIGN (SG)

On going research projects

N/A

Selected finished research projects

CLOUDFLOW
Project title: Computational Cloud Services and Workflows for Agile Engineering. HPC Workflow for Simulation of Additive Manufacturing for Improving the Production of Gearboxes
Call identifier: CloudFlow-2
Project ID: 609100
Starting date: 01-01-2016
Duration: 36 months
Project coordinator: CENTRE INTERNACIONAL DE METODES NUMERICS EN ENGINYERIA (ES)
Partners: STAM SRL (IT), Consorci de Serveis Universitaris de Catalunya (ES)

EMUSIC
Project title: Efficient Manufacturing for Aerospace Components Using Additive Manufacturing, Net Shape HIP and Investment Casting
Call identifier: H2020-MG-2015_SingleStage-A
Project ID: 690725
Programme: H2020-EU.3.4
Record number: 199614
Starting date: 01-04-2016
Duration: 36 months
Budget CIMNE: 179.000 
Project coordinator: THE UNIVERSITY OF BIRMINGHAM (UK)
Partners: ESI SOFTWARE GERMANY GMBH (DE), ROLLS-ROYCE PLC (UK), ESI GROUP (FR), INTERNATIONAL CENTER FOR NUMERICAL METHODS IN ENGINEERING (ES), AIRBUS GROUP (FR), INDUSTRIA DE TURBO PROPULSORES S.A. (ES), FRAUNHOFER GESELLSCHAFT ZUR FORDERUNG DER ANGEWANDTEN FORSCHUNG EV (DE), GOODRICH ACTUATION SYTEMS LTD (UK), CALCOM ESI (CH), TWI LTD (UK), INSTITUTE OF METAL RESEARCH, CHINESE ACADEMY OF SCIENCES (China), AVIC Beijing Institute of Aeronautical Materials (China), AVIC Beijing Aeronautical Manufacturing Technology Research Institute (China), Huazhong University of Science and Technology (China), TSINGHUA UNIVERSITY (China), AVIC COMMERCIAL AIRCRAFT ENGINE CO., LTD (China), COMAC Shanghai Aircraft Design And Research Institute (China)

CAxMan
Project title: Computer Aided Technologies for Additive Manufacturing (CAxMan)
Call identifier: H2020-FoF-2015_CNECT
Project ID: 680448
Programme: H2020-EU.2.1.1
Record number: 198363
Starting date: 01-09-2015
Duration: 36 months
Budget CIMNE: 511.000 
Project coordinator: STIFTELSEN SINTEF (NO)
Partners: FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V (DE), DEUTSCHES FORSCHUNGSZENTRUM FUER KUENSTLICHE INTELLIGENZ GMBH (DE), CONSIGLIO NAZIONALE DELLE RICERCHE (IT), CENTRE INTERNACIONAL DE METODES NUMERICS EN ENGINYERIA (ES), ARCTUR RACUNALNISKI INZENIRING DOO (SI), BOC ASSET MANAGEMENT GMBH (AT), MISSLER SOFTWARE (FR), JOTNE EPM TECHNOLOGY AS (NO), STAM SRL (IT), TRIMEK SA (ES), TRONRUD ENGINEERING AS (NO), NOVATRA (FR)

ICMEg
Project title: Integrated Computational Materials Engineering expert group (ICMEg)
Call identifier: FP7-NMP-2013-CSA-7
Project ID: 606711
Programme: FP7-NMP
Record number: 109358
Starting date: 01-10-2013
Duration: 36 months
Budget CIMNE: 90.000 
Project coordinator: ACCESS e.V.
Partners: ACCESS e.V., K&S Gmbh Projektmanagement, E-Xstream Engineering SA, Fundaci贸n IMDEA Materiales, Thermo-Calc Software AB, Stichting Materials innovation institute (M2i), Czech Technical University (CTU), Rheinisch-Westfaelische Technische Hochschule Aachen (RWTH Aachen)CIMNE, Simufact Engineering Gmbh, Kungliga Tekniska Hoegskolan (KTH)

FLEXICAST
Project title: Robust and Flexible Cast Iron Manufacturing (FLEXICAST)
Call identifier: FP7-NMP-2012-ICT-FoF
Project ID: 314540
Programme: FP7-NMP
Record number: 104690
Starting date: 01-11-2012
Duration: 48 months
Budget CIMNE: 110.000 
Project coordinator: UPC BarcelonaTech
Partners: UPC BarcelonaTech, Fundiciones de Roda, Proservice TechnologyOndarlanTecnaliaSERT MetalASCAMMCNRCOMAUCIMNETSS ModenaInnospeXionPUT Poznan, ARC

COLTS
Project title: Casting of Large Ti Structures (COLTS)
Call identifier: FP7-AAT-2010-RTD-CHINA
Project ID: 265697
Programme: FP7-TRANSPORT
Record number: 97237
Starting date: 01-10-2010
Duration: 36 months
Budget CIMNE: 120.000 
Partners: Interdisciplinary Research Centre in Materials for High Performance Application (IRC), AirbusEuropean Space Agency (ESA), Calcom ESI SA, INGENIA, EADS, Beijing Institute of Aeronautic Materials (BIAM), Huazhong University of Science & Technology (HUST), Institute of Metal Research (IMR), Beijing BAMTRI Technology and Development Company (BAMTRI), Tsinghua University, Monash University

VERDI
Project title: Virtual Engineering for Robust Manufacturing with Design Integration (VERDI)
Call identifier: FP6-2003-AERO-1
Reference: AST4-CT-2005-516046
Project ID: 516046
Programme: FP6-AEROSPACE
Record number: 75768
Starting date: 01-09-2005
Duration: 52 months
Budget CIMNE: 269.500 
Project coordinator: Volvo Aero Corporation
Partners: Volvo Aero Corporation, CIMNE, Lule氓 tekniska universitet (LTU), University of Trollh盲ttan/Uddevalla (HTU), Rolls-Royce, University of Nottingham, MTU Aero Engines, WZL RWTH Aachen, Universit盲t Karlsruhe (TH), ITP, AICIA, Techspace Aero, CENAERO, AVIO, Politecnico Torino, EnginSoft

DEEPWELD
Project title: Detailed Multi-Physics Modelling of Friction Stir Welding
Call identifier: FP6-2003-AERO-1
Reference: AST4-CT-2005-516134
Project ID: 516134
Programme: FP6-AEROSPACE
Record number: 75787
Starting date: 01-04-2005
Duration: 45 months
Budget CIMNE: 122.750 
Project coordinator: CENAERO
Partners: CENAERO, Quantech ATZ, SAMTECH, CIMNE, UCL, IDS, QUB, EADS CCR, SONACA, ARMINES

VIF-CA
Project title: Virtual Intelligent Forging - CA (VIF-CA)
Project ID: 507331
Programme: FP6-IST
Record number: 80741
Starting date: 01-07-2004
Duration: 54 months
Project coordinator: CEMEF
Partners: More than 50 partners including CIMNE

FOAMCAST
Project title: Shortening lead times and improving quality by innovative upgrading of the lost foam casting process (FOAMCAST)
Project ID: G1RD-CT-2000-00417
Programme: FP5-GROWTH
Record number: 54227
Starting date: 01-02-2001
Duration: 36 months
Project coordinator: Castings Technology International (CTI)
Partners: Castings Technology International (CTI), Servo Technique International Ltd, Roca Calefacci贸n S.L., Procento Metallurgie SRO, Saint-Gobain Pipelines PLC, Huttenes Albertus France, CIMNE, Magotteaux International SA

DARCAST
Project title: Enhanced design and manufacturing of high resistance cast parts (DARCAST)
Programme: CRAFT
Project ID: BES2-5637
Contract no.: BRST-CT98-5328
Starting date: 01-10-1998
Duration: 24 months
Project coordinator: CIMNE
Partners: Metalogenia, Fundiciones de Roda, FERESPE, SONAFI, Fonderie 2A, FOND-STAMP, LAEMPE, CIMNE, Quantech ATZ, INEGI, Politecnico Torino

DECAST
Project title: Enhanced design environment for industrial casting processes on parallel computing platforms (DECAST)
Programme: FP4-ESPRIT 4
Project ID: 28144
Record number: 48646
Starting date: 01-09-1998
Duration: 30 months
Partners: Quantech ATZCIMNE, FERESPE, Fundiciones Miguel Ros, IPPT-PAN, RUS, TEKSID

DILAMP
Project title: Diode lasers in material processing (DILAMP)
Programme: BRITE EURAM
Project ID: BE97-5060
Contract no.: BRPR-CT98-0673
Starting date: 01-09-1998
Duration: 18 months
Partners: Centro Ricerche FIAT (CRF), British Aerospace (BA), Robert Bosch Gmbh, Dilas Diodenlaser Gmbh, Universit脿 di Napoli, Zentrum Fertigungstechnik Stuttgart (ZFS), CIMNE

FORCAST
Project title: Validation of a foundryman’s design system for simulation of casting processes (FORCAST)
Programme: INNOVATION
Contract no.:
Starting date: 01-09-1997
Duration: 6 months
Partners: Quantech ATZCIMNE, University of Birmingham

PREDWEAR
Project title: Development of a decisi贸n support system for predicting wear in bulk and sheet metal forming operations (PREDWEAR)
Programme: BRITE EURAM
Contract no: BE-5248-92
Starting date: 01-11-1992
Duration: 36 months
Partners: CIMNE

NUMIFORM
Project title: Numerical simulation of industrial sheet metal forming processes
Programme: BRITE EURAM
Contract no: P-2029-5
Starting date: 01-01-1989
Duration: 60 months
Partners: CIMNE

Submitted not funded research projects

METAMACHINE
Project title:  A new method for integrating the Factory of the Future in one machine by setting up the framework for building hybrid machines
Proposal acronym: METAMACHINE
Call: FoF-01-2016
Topic: Novel hybrid approaches for additive and subtractive manufacturing machines
Type of action: CS2-RIA
Duration: 36 months
Status: Not funded

SIMTOOL4AM
Project title: Integration of a virtual tool in the process preparation of additive manufacturing for aero engine applications assisted by computationally efficient simulation
Proposal acronym: SIMTOOL4AM
Call: H2020-CS2-CFP02-2015-01
Topic: JTI-CS2-2015-CFP02-ENG-02-02
Type of action: CS2-RIA
Proposal number: 717075
Duration: 36 months
Status: Not funded


NATIONAL/REGIONAL FUNDED RESEARCH PROJECTS

Submitted research projects

N/A

On going research projects

RIS3CAT: BASE3D - LIGHT3D
Project title: LIGHT3D: Tecnologies de L脿ser i altra Llum (Agrupaci贸 BASE3D)
Code SIFECAT: 001-P-001646
Starting date: 1 Jan 2019
Modified starting date: 1 Jan 2020
Duration 3 years
Funding bodies: GENCAT
Grant: EUR 64.129,05
Project coordinator: CIM-UPC (BASE3D), LEITAT (LIGHT3D)
Partners: LIGHT3D: LEITAT, CIMNE, UPC (IMEM), ICIQ, IREC

Selected finished research projects

RIS3CAT: LLAVOR3D - TRANSPORT
Project title: Ecosistema d'R+D+i per la implementaci贸 i adopci贸 de la Fabricaci贸 Additiva / Impressi贸 3D a la ind煤stria del transport (TRANSPORT)
Programme: Acreditaci贸 de comunitats RIS3CAT i la selecci贸 de projectes col.laboratius de recerca, desenvolupament i innovaci贸
Reference: COMRDI16-1-0010
Starting date: 1 Jul 2017
Modified starting date: 1 Jan 2018
Duration: 3 years
Funding bodies: ACCI脫
Grant: EUR 140.991,55
Project coordinator: CIMNE
Project leader: C. Agelet de Saracibar
Partners: CIMNE, IQS, LEITAT, ELIX POLYMERS, FUNDACIO CIM, HEWLETT-PACKARD, ATOTECH, ALSTOM, TECALUM

RIS3CAT: LLAVOR3D - PRO2
Project title: Ecosistema d'R+D+i per la implementaci贸 i adopci贸 de la Fabricaci贸 Additiva / Impressi贸 3D a la fabricaci贸 de productes industrials i als procesos industrials de producci贸n (PRO2)
Programme: Acreditaci贸 de comunitats RIS3CAT i la selecci贸 de projectes col.laboratius de recerca, desenvolupament i innovaci贸
Reference: COMRDI16-1-009
Starting date: 1 Jul 2017
Modified starting date: 1 Jan 2018
Duration: 3 years
Funding Bodies: ACCI脫
Grant: EUR 80.226,10
Project coordinator: LEITAT
Partners: LEITAT, CIMNE, HEWLETT-PACKARD, EURECAT, ULTRASION, FISA, CONIEX, CTM, FLUIDRA, ALMIRALL, VIRUTEX

ADaMANT
Project title: Marco computacional para la fabricaci贸n aditiva de componentes de aleaciones de titanio
Programme: Programa Estatal de Fomento de la Investigaci贸n Cient铆fica y T茅cnica de Excelencia, Subprograma Estatal de Generaci贸n de Conocimiento
Reference: DPI2017-85998-P
Starting date: 01-01-2018
Duration: 3 years

TECNOFUS
Project t铆tle: Propuesta de Nuevo Programa de Tecnolog铆a de Fusi贸n Termonuclear
Programme: CONSOLIDER INGENIO 2010, Ministerio de Ciencia e Innovaci贸n
Reference: MICINN-08-CSD2008-00079
Starting date: 15-12-2008
Duration: 60 months
Project coordinator: CIEMAT
Partners: CIEMATCIMNECentro de Estudios e Investigaciones T茅cnicas de Guipuzcoa (CEIT)Universidad Pontificia de Comillas (COMILLAS)Universidad del Pa铆s Vasco (UPV-EHU)Instituto Qu铆mico de Sarri谩 (IQS)Instituto Tecnol贸gico de Materiales (ITMA)Universidad Complutense de Madrid (UCM)Universidad Nacional de Educaci贸n a Distancia (UNED)Universidad Polit茅cnica de Catalu帽a (UPC BarcelonaTech)Universidad Polit茅cnica de Madrid (UPM)

G-BLOCK
Project title: Investigaci贸n sobre nuevos hornos i贸nicos
Programme: Centro para el Desarrollo Tecnol贸gico Industrial (CDTI), Ministerio de Ciencia e Innovaci贸n
Starting date: 01-10-2010
Duration: 15 months
Partners: CIMNE, GEOMETRICS

SIM.PCM
Project title: Aplicaci贸n de TIC para la optimizaci贸n de los procesos de fundici贸n mediante simulaci贸n por ordenador considerando par谩metros de calidad metal煤rgica
Programme: AVANZA-TRACTOR, Ministerio de Industria, Comercio y Turismo
Reference: TSI-020302-2008-19
Starting date: 01-01-2009
Duration: 39 months
Partners: Quantech ATZ, CIMNE, AZTERLAN, FYTASA

MAGNO
Project title: Magnesium New Technological Opportunities
Programme: CENIT, Centro para el Desarrollo Tecnol贸gico Industrial (CDTI), Ministerio de Industria, Comercio y Turismo
Reference:
Starting date: 01-01-2008
Duration: 48 months
Project coordinator: Grupo Antolin
Partners: Grupo Antolin, AKABA, BOSTLAN, S.A., CONIEX, S.A:, ECOFOND, Fagor Electr贸nica, GIS 2003, S.L., Industrias Lebario, INSERTEC, MUGAPE, PRETRANSA, REYDESA, Grupo TTT, Grupo TTC, CENIM, CTC, CTME, CIDAUT, CIDETEC, CIMNE, FATRONIK, IKERLAN, INASMET, IMDEA, INATEC, UNNE, UCM, Universidad de Alicante, UBU, UPC, UPM

FSW
Project title: Simulaci贸n num茅rica del proceso de soldadura mediante batido por fricci贸n (Frictional Stir Welding)
Programme: Proyectos de Investigaci贸n Cient铆fica y Desarrollo Tecnol贸gico, Ministerio de Ciencia y Tecnolog铆a
Reference: DPI-2005-65887
Starting date: 01-10-2007
Duration: 36 months

SEDUREC
Project title: Seguridad y durabilidad de estructuras de construcci贸n
Programme: CONSOLIDER INGENIO 2010, Ministerio de Ciencia y Tecnolog铆a
Reference: CSD2006-60
Starting date: 01-01-2007
Duration: 48 months

FSWNET
Project title: Nuevas herramientas de simulaci贸n para optimizar el proceso de soldadura por fricci贸n
Programme: PROFIT, Ministerio de Ciencia y Tecnolog铆a
Reference: CIT-020400-2007-0082
Starting date: 01-01-2007
Duration: 36 months
Partners: CIMNE, Serra Soldadura S.A.

Submitted not funded research projects

EACYWELD
Project title: Enhanced accuracy computational framework for FSW processes
Programme: Programa Estatal de Fomento de la Investigaci贸n Cient铆fica y T茅cnica de Excelencia, Ministerio de Econom铆a y Competitividad
IP1: Miguel Cervera, IP2: Carlos Agelet de Saracibar
Duration: 36 months
Status: Not funded


PRIVATE FUNDED CONSULTING PROJECTS

On going consulting projects

LEADING-ITER-FW
Project title: ITER First Wall (FW) Mock-up: Numerical Simulation of the Manufacturing Chain
Funding company: LEADING
Starting date: 01-03-2017
Dedication: 3.5 MM
Duration: 2 months
Budget: 20.000 

EURECAT
Project title: Numerical Simulation of AM Processes
Funding company: EURECAT
Starting date: 01-11-2015
Duration: 26 months
Budget: 300.000 

Selected finished consulting projects

SAPA-FSW
Project title: Numerical Simulation of FSW Processes
Agreement: CIMNE/SAPA Sweden
Starting date: 01-10-2015
Duration: 5 months
Budget: 20.000 

F4E-ITER-FW
Project title: ITER-FW-HIP: Numerical Simulation of the ITER First Wall (FW) Hot Isostatic Pressing (HIP) Manufacturing Process
Call for Tenders No.: F4E-OPE-0589 CIMNE/Fusion for Energy (F4E)
Starting date: 25-11-2014
Duration: 12 months
Budget: 49.673 

NEST
Project title: ENERGIX LS-TES: Innovative Thermal Energy Storage (TES)
Agreement: CIMNE/NEST AS/Norwegian Research Council
Starting date: 01-01-2015
Duration: 12 months
Budget: NOK 500.000

NEST
Project title:ENERGIX LS-TES: Innovative Thermal Energy Storage (TES)
Agreement: CIMNE/NEST AS/Norwegian Research Council
Starting date: 01-04-2014
Duration: 9 months
Budget: NOK 350.000

ABENGOA-VMD
Project title: Virtual Materials Design (VMD)
Agreement: CIMNE/ABENGOA
Starting date: 01-06-2013
Duration: 5 months

MPS - NIPPON STEEL-NPP
Project title: Analysis of Model Plan of NPP Severe Accident
Funding company: Mitsui & Co. Plant Systems, Ltd. (MPS)
Starting date: 01-05-2014
Duration: 4 months

METALOGENIA-SIDECAM
Project title: Sistema experto para eliminaci贸n de defectos y control de calidad de la fabricaci贸n de piezas de acero moldeado (SIDECAM)
Agreement: CIMNE/METALOGENIA, S.A.
Starting date: 01-01-1998
Duration: 12 months

METALOGENIA-FUNDICI脫N
Project title: Simulaci贸n num茅rica de procesos de fundici贸n
Agreement: CIMNE/METALOGENIA, S.A.
Starting date: 01-01-1996
Duration: 24 months

METALOGENIA
Project title: Estudio de la resistencia de piezas de acero moldeado
Agreement: CIMNE/METALOGENIA, S.A.
Starting date: 01-01-1995
Duration: 12 months

REGIENOV/RENAULT-VULCAN
Project title: Developement du logiciel VULCAN. Simulation thermom茅canique du procedes de fonderie
Agreement: CIMNE/REGIENOV RENAULT Paris
Starting date: 01-01-1995
Duration: 60 months

MIKALOR
Project title: An谩lisis y optimizaci贸n del conformado de dientes de rodillo por el MEF
Agreement: CIMNE/MIKALOR, S.A.
Starting date: 01-05-1994
Duration: 24 months

MATRIX | PREDWEAR
Project title: Asesoramiento para el desarrollo del proyecto PREDWEAR
Agreement: CIMNE/MATRIX, S.A:
Starting date: 01-11-1992
Duration: 48 months

CANDEMAT-PREDWEAR
Project title: Asesoramiento para el desarrollo del proyecto PREDWEAR
Agreement: CIMNE/CANDEMAT
Starting date: 01-11-1992
Duration: 48 months

CANDEMAT-ESTAMPACI脫N
Project title: Simulaci贸n num茅rica de procesos de estampaci贸n de chapa
Agreement: CIMNE/CANDEMAT
Starting date: 01-01-1987
Duration: 48 months

No comments :

Post a Comment

Note: only a member of this blog may post a comment.